Securing the Electronic Components
We began the soldering process on the breadboard, knowing that the laser diodes, the 4 segment displays, and the solenoid valves require...


Netting installed
We have installed the netting that will hold the ping pong balls into the frame. For the netting material, we bought a stretchable...


Pneumatic components are now properly configured and attached to the frame
We have successfully configured all of our pneumatic components. A 1/4" hose with quick disconnect fittings on either end will connect...


Panel for the Viewing Window
Acrylic was used as the material for the player's viewing window because it provides a sturdy yet transparent barrier between the player...


Installing the Polyethylene Film onto the Frame
We used polyethylene film for the the observers viewing window. The edges of the film were lined with duct tape and attached to the frame...


Pneumatic System Testing
The entire pneumatic setup was tested out today. We brought the air compressor, along with all of our hoses and manifolds, from the 706...


Brackets for the Internal Acrylic Barrier
Using the corner braces that we had remaining, we made a system for holding acrylic on the inside of the frame. The holder consists of...


Completion of the Housing
The housing that is to be responsible for mounting the barrel of the blowgun onto the shaft is completed. The above housing has two...


Aluminum Manifold
Two aluminum manifolds were milled out. The rectangular shape of the manifold was first carved into shape using a 1/2'' endmill. Then,...